Work Breakdown Structure
Jobs
Active Work Breakdown Structure roles are indexed directly from company ATS systems — Greenhouse, Lever, Workday, Ashby, and 15+ others. Advertised salaries average $376k/year based on live listings. 38% of roles are remote-friendly. These listings don't come from other job boards — they're pulled from source, so many won't appear on LinkedIn, Indeed, or Glassdoor.
Open Roles
0
Avg Salary
$376k
Remote-Friendly
38%
Added This Week
44
Aircraft Structure Repair Engineer
Airbus
Tooling Mechanic - Large Structure Fabrication
The Boeing Company
Working Party Aircraft Structure Expert
Airbus Americas, Inc.
Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management
Airbus Operations
HAPS Structure and Mechanisms Engineer (d/f/m)
AIRBUS GEOTECH, S. A
Senior Principal Structure Engineer
AtkinsRéalis
Working Student, LV Structures (m/f/d)
Isar Aerospace SE
Apprentice - Structures
Airbus India Private Limited
Market Structure
Kalshi
Technicien(ne) - dessinateur(trice) en structure
AtkinsRéalis
Structural Bridge Engineer
Apex Companies
Regional Sales Director, Structural Heart - Structural Interventions
Abbott
Structured Trade Finance Manager
Engelhart
Regional Sales Director, Structural Heart - Structural Interventions
Abbott
Clinical Sales Specialist, Structural Heart - Structural Interventions
Abbott
Clinical Sales Specialist, Structural Heart - Structural Interventions
Abbott
Insurance Tax Structuring, AVP
KKR
Civil & Steel Structure Engineer
液化空气工程与制造中国
Civil Structural Engineer
AtkinsRéalis
Civil/Structural Inspector
AtkinsRéalis
Civil/Structural Inspector
AtkinsRéalis
Steel Structural Inspector
AtkinsRéalis
Structures & Payload Design Engineer (Structural Design)
Boeing
Lead Engineer – Seat Structure
Magna
Engineering Manager – Seat Structure
Magna
Entry-Level Structural Analysis Engineer
Boeing Poland
Structural Analysis Engineer (Experienced or Senior) (Structural Analysis)
The Boeing Company
Working Student
Planet
Executive Director, QIS Structuring
Wells Fargo
Senior Scientist in Structural Biophysics
Sanofi
Structural Analysis Engineer - Experienced/ Senior
The Boeing Company
Assistant Structural Designer
AtkinsRéalis
Structural Design Engineer - Experienced/Senior
The Boeing Company
Trainee Structural Designer
AtkinsRéalis
Structural Expert
Senior Structural Civil Engineer
AtkinsRéalis
Work Preparation Process Engineer
Airbus Operations SL
Structured Products Sales Support
Evooq
Civil Structural Engineer
AtkinsRéalis
Associate Structural Analysis Engineer
Boeing India Private Limited
Civil Structural Engineer
AtkinsRéalis
Civil Structural Engineer
AtkinsRéalis
Structures Technical Analyst (Associate and Mid-Level)
Boeing
Work & Travel Stationssupport (m/w/d)
roadsurfer
Structural Analysis Engineer (Associate or Mid- Level)
Boeing
Account Manager, Structural Heart, Cardiac Surgery
Abbott
Senior Structural Engineer (Engenheiro Estrutural Senior)
Making Energy Safer Cleaner And More Efficient
Mechanical & Structural Engineering Manager (K Level)
Boeing
Structural Design Engineer (m/w/d)
Airbus Defence and Space
Account Manager, Structural Heart, Cardiac Surgery
Abbott
Related Searches
Similar Roles
Common Questions
- How many Work Breakdown Structure jobs are available?
- JobsGlitch lists active Work Breakdown Structure jobs sourced daily from Greenhouse, Lever, Ashby, Workday, and other top ATS platforms.
- What skills are required for Work Breakdown Structure roles?
- The most in-demand skills for Work Breakdown Structure roles are Structural analysis, Structural design, Sales, Finite element analysis, 3D modeling. Requirements vary by seniority and company.
- What is the average salary for a Work Breakdown Structure?
- The average salary for Work Breakdown Structure roles on JobsGlitch is approximately $376k/year. Compensation varies by location, seniority, and company.
- Are there remote Work Breakdown Structure jobs?
- Yes — 38% of Work Breakdown Structure jobs on JobsGlitch are remote-friendly. Browse remote Work Breakdown Structure jobs at jobsglitch.com/jobs/remote/work-breakdown-structure.