Remote Work Breakdown Structure Jobs
No openings found
Remote Roles
0
Avg Salary
$378k
Added This Week
43
Top Skill
Structural analysis
Top Skills
Structural analysis 24%Structural design 18%Finite element analysis 10%Sales 8%Structural engineering 6%Hand calculations 6%3D modeling 6%Structural modeling 6%Structural Heart 6%Structural inspection 6%Road infrastructure 6%Quality control 6%
Aircraft Structure Repair Engineer
Airbus
Remote Professional FULL TIME $1500k–$2500k Direct
Tooling Mechanic - Large Structure Fabrication
The Boeing Company
Remote FULL TIME $0k–$0k Direct
Working Party Aircraft Structure Expert
Airbus Americas, Inc.
Remote FULL TIME $95k–$135k Direct
Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management
Airbus Operations
Remote Student PART TIME $0k+ Direct
HAPS Structure and Mechanisms Engineer (d/f/m)
AIRBUS GEOTECH, S. A
Remote Mid FULL TIME $48k–$68k Direct
Senior Principal Structure Engineer
AtkinsRéalis
Remote Senior FULL TIME $2000k–$3500k Direct
Working Student, LV Structures (m/f/d)
Isar Aerospace SE
Remote $36k–$48k Direct
Apprentice - Structures
Airbus India Private Limited
Remote Entry FULL TIME $240k–$360k Direct
Structural Bridge Engineer
Apex Companies
Remote $100k–$120k Direct
Technicien(ne) - dessinateur(trice) en structure
AtkinsRéalis
Remote FULL TIME $65k–$85k Direct
Market Structure
Kalshi
Remote FULL TIME $145k–$215k Direct
Structured Trade Finance Manager
Engelhart
Remote Manager FULL TIME $155k–$220k Direct
Regional Sales Director, Structural Heart - Structural Interventions
Abbott
Remote Director FULL TIME $113k–$227k Direct
Regional Sales Director, Structural Heart - Structural Interventions
Abbott
Remote Director FULL TIME $113k–$227k Direct
Clinical Sales Specialist, Structural Heart - Structural Interventions
Abbott
Remote FULL TIME $78k–$156k Direct
Clinical Sales Specialist, Structural Heart - Structural Interventions
Abbott
Remote FULL TIME $78k–$156k Direct
Insurance Tax Structuring, AVP
KKR
Remote $120k–$160k Direct
Civil Structural Engineer
AtkinsRéalis
Remote Mid FULL TIME $95k–$135k Direct
Civil & Steel Structure Engineer
液化空气工程与制造中国
Remote Senior FULL TIME $325k–$515k Direct
Civil/Structural Inspector
AtkinsRéalis
Remote FULL TIME $210k–$325k Direct
Civil/Structural Inspector
AtkinsRéalis
Remote FULL TIME $240k–$360k Direct
Steel Structural Inspector
AtkinsRéalis
Remote FULL TIME $200k–$350k Direct
Structures & Payload Design Engineer (Structural Design)
Boeing
Remote Senior FULL TIME $104k–$140k Direct
Entry-Level Structural Analysis Engineer
Boeing Poland
Remote Entry FULL TIME $100k–$140k Direct
Senior Associate, BESS Modeling & Structuring
Clearway Energy
Remote Senior $135k–$185k Direct
Lead Engineer – Seat Structure
Magna
Remote Lead FULL TIME $2200k–$3500k Direct
Engineering Manager – Seat Structure
Magna
Remote Manager FULL TIME $2150k–$3450k Direct
Working Student
Planet
Remote PART TIME $24k–$36k Direct
Structural Analysis Engineer (Experienced or Senior) (Structural Analysis)
The Boeing Company
Remote Senior FULL TIME $118k–$144k Direct
Executive Director, QIS Structuring
Wells Fargo
Remote Executive FULL TIME $215k–$355k Direct
Senior Scientist in Structural Biophysics
Sanofi
Remote Senior FULL TIME $48k–$64k Direct
Structural Analysis Engineer - Experienced/ Senior
The Boeing Company
Remote Senior FULL TIME $104k–$140k Direct
Structural Design Engineer - Experienced/Senior
The Boeing Company
Remote Senior FULL TIME $104k–$140k Direct
Work Preparation Process Engineer
Airbus Operations SL
Remote Professional FULL TIME $45k–$65k Direct
Senior Structural Civil Engineer
AtkinsRéalis
Remote Senior FULL TIME $105k–$145k Direct
Assistant Structural Designer
AtkinsRéalis
Remote Mid FULL TIME $1150k–$1750k Direct
Structured Products Sales Support
Evooq
Remote mid FULL TIME $115k–$155k Direct
Trainee Structural Designer
AtkinsRéalis
Remote Entry FULL TIME $450k–$750k Direct
Structural Expert
Remote Senior FULL TIME $2200k–$3500k Direct
Associate Structural Analysis Engineer
Boeing India Private Limited
Remote FULL TIME $2250k–$3500k Direct
Civil Structural Engineer
AtkinsRéalis
Remote FULL TIME $50k–$75k Direct
Civil Structural Engineer
AtkinsRéalis
Remote FULL TIME $75k–$105k Direct
Structures Technical Analyst (Associate and Mid-Level)
Boeing
Remote Mid FULL TIME $57k–$77k Direct
Civil Structural Engineer
AtkinsRéalis
Remote FULL TIME $55k–$75k Direct
Work & Travel Stationssupport (m/w/d)
roadsurfer
Remote FULL TIME $31k–$33k Direct
Structural Analysis Engineer (Associate or Mid- Level)
Boeing
Remote Mid FULL TIME $115k–$155k Direct
Account Manager, Structural Heart, Cardiac Surgery
Abbott
Remote Entry FULL TIME $61k–$123k Direct
Senior Structural Engineer (Engenheiro Estrutural Senior)
Making Energy Safer Cleaner And More Efficient
Remote Senior FULL TIME $215k–$330k Direct
Certified Structural Repair Technician
Transat AT
Remote mid FULL TIME $58k–$75k Direct
Mechanical & Structural Engineering Manager (K Level)
Boeing
Remote Manager FULL TIME $147k–$199k Direct
Related Searches
All Work Breakdown Structure Jobs by City
Common Questions
- Are there remote Work Breakdown Structure jobs available?
- Yes — JobsGlitch lists remote Work Breakdown Structure jobs sourced daily from Greenhouse, Lever, Ashby, and Workday. No signup required to apply.
- What skills do remote Work Breakdown Structure roles require?
- Remote Work Breakdown Structure roles most commonly require Structural analysis, Structural design, Finite element analysis, Sales, Structural engineering.
- What is the salary for a remote Work Breakdown Structure?
- The average salary for remote Work Breakdown Structure roles on JobsGlitch is approximately $378k/year. Remote roles often offer competitive packages independent of location.