See your match scores

Work Breakdown Structure Jobs in Austin

No openings found

Active Work Breakdown Structure roles in Austin, indexed directly from company ATS systems — not reposted from LinkedIn, Indeed, or Glassdoor. Upload your resume to see your match score against open positions.

Working Party Aircraft Structure Expert

Airbus Americas, Inc.

Mobile Area, AL Onsite Direct
Apply →

Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management

Airbus Operations

Germany Hybrid Student Direct
Apply →

Tooling Mechanic - Large Structure Fabrication

The Boeing Company

USA - Berkeley, MO Onsite Direct
Apply →

Aircraft Structure Repair Engineer

Airbus

India Onsite Professional Direct
Apply →

Working Student, LV Structures (m/f/d)

Isar Aerospace SE

Ottobrunn, Bavaria, Germany Onsite Direct
Apply →

Apprentice - Structures

Airbus India Private Limited

India Onsite Entry Direct
Apply →

Structured Trade Finance Manager

Engelhart

Stamford, Connecticut Onsite Manager Direct
Apply →

Structural Bridge Engineer

Apex Companies

Issaquah, Washington, United States Onsite Direct
Apply →

Civil/Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Civil/Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Structures & Payload Design Engineer (Structural Design)

Boeing

USA - Mesa, AZ Onsite Senior Direct
Apply →

HAPS Structure and Mechanisms Engineer (d/f/m)

AIRBUS GEOTECH, S. A

Barcelona Hybrid Mid Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

United States of America Remote Director Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

United States of America Remote Director Direct
Apply →

Insurance Tax Structuring, AVP

KKR

Boston Hybrid Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

United States of America Remote Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

United States of America Remote Direct
Apply →

Civil Structural Engineer

AtkinsRéalis

CA.QC.Montréal.455 boul. René-Lévesque Ouest Hybrid Mid Direct
Apply →

Structural Analysis Engineer (Lead)

Boeing

USA - Long Beach, CA Onsite Lead Direct
Apply →

Senior Principal Structure Engineer

AtkinsRéalis

EG.Cairo Onsite Senior Direct
Apply →

Steel Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Entry-Level Structural Analysis Engineer

Boeing Poland

POL - Warsaw, Poland Hybrid Entry Direct
Apply →

Senior Associate, BESS Modeling & Structuring

Clearway Energy

Denver, Colorado, United States Hybrid Senior Direct
Apply →

Structural Analysis Engineer - Experienced/ Senior

The Boeing Company

USA - Berkeley, MO Onsite Senior Direct
Apply →

Structural Design Engineer - Experienced/Senior

The Boeing Company

USA - Berkeley, MO Onsite Senior Direct
Apply →

Structural Analysis Engineer (Experienced or Senior) (Structural Analysis)

The Boeing Company

USA - Seal Beach, CA Onsite Senior Direct
Apply →

Senior Structural Civil Engineer

AtkinsRéalis

CA.QC.Montréal.455 boul. René-Lévesque Ouest Hybrid Senior Direct
Apply →

Senior Scientist in Structural Biophysics

Sanofi

Neuville-Sur-Saône Onsite Senior Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

USA - Tukwila, WA Onsite Mid Direct
Apply →

Executive Director, QIS Structuring

Wells Fargo

NEW YORK, NY Onsite Executive Direct
Apply →

Structured Products Sales Support

Evooq

Lausanne, VD, CH Hybrid mid Direct
Apply →

Associate Structural Analysis Engineer

Boeing India Private Limited

IND - Bangalore, India Onsite Direct
Apply →

Working Student

Planet

Berlin Office Hybrid Direct
Apply →

Assistant Structural Designer

AtkinsRéalis

India Remote Mid Direct
Apply →

Trainee Structural Designer

AtkinsRéalis

India Remote Entry Direct
Apply →

Civil Structural Engineer

AtkinsRéalis

United Kingdom Hybrid Direct
Apply →

Structural Expert

Brno, Jihomoravský kraj, Czechia Onsite Senior Direct
Apply →

Civil Structural Engineer

AtkinsRéalis

United Kingdom Hybrid Direct
Apply →

Civil Structural Engineer

AtkinsRéalis

United Kingdom Hybrid Direct
Apply →

Structural Analysis Engineer (Associate or Mid- Level)

Boeing

USA - North Charleston, SC Onsite Mid Direct
Apply →

Technicien(ne) - dessinateur(trice) en structure

AtkinsRéalis

CA.QC.Montréal.455 boul. René-Lévesque Ouest Hybrid Direct
Apply →

Account Manager, Structural Heart, Cardiac Surgery

Abbott

United States of America Remote Entry Direct
Apply →

Mechanical & Structural Engineering Manager (K Level)

Boeing

USA - Tukwila, WA Onsite Manager Direct
Apply →

Structural Design Engineer (m/w/d)

Airbus Defence and Space

Manching Onsite Entry Level Direct
Apply →

Senior Structural Engineer (Engenheiro Estrutural Senior)

Making Energy Safer Cleaner And More Efficient

BR-RJ-RIO DE JANEIRO-RETIC-ILHA DO FUNDAO, R.36, 2757 Hybrid Senior Direct
Apply →

Certified Structural Repair Technician

Transat AT

Montreal, Quebec, Canada Onsite mid Direct
Apply →

Market Structure

Kalshi

New York Office Onsite Direct
Apply →

Account Manager, Structural Heart, Cardiac Surgery

Abbott

United States of America Remote Entry Direct
Apply →

New College Grad - CMOS & Metallization Test Structure Design and Layout

Micron Technology

Jalisco, Mexico Onsite Entry Direct
Apply →

Market Development Consultant, Structural Heart, TAVR

Medtronic

Mounds View, Minnesota, United States of America Onsite Direct
Apply →

See how you match these Work Breakdown Structure roles

Upload your resume and get a skill match score for every job

Get match scores →

Common Questions

How many work breakdown structure jobs in austin are available?
JobsGlitch lists active work breakdown structure jobs in austin sourced directly from company ATS platforms — not reposted from LinkedIn.
Are these Work Breakdown Structure roles actually hiring in Austin?
Yes — every listing is indexed directly from company career pages (Greenhouse, Lever, Workday, Ashby). These are not aggregated from other job boards, so they reflect live hiring intent.
What skills do Work Breakdown Structure jobs in Austin require?
Required skills vary by employer and seniority. Browse the listings above to see the specific requirements for each open role.
How do I apply for work breakdown structure jobs in austin?
Click any job listing to view the full description and apply directly on the company's career page. Upload your resume on JobsGlitch first to see your match score before applying.