Remote Work Breakdown Structures Jobs

No openings found

Remote Roles

0

Avg Salary

$1556k

Added This Week

47

Top Skill

Structural analysis

Top Skills

Structural analysis 26%Structural engineering 18%Structural design 18%System integration 6%Stress analysis 6%Structures Design 6%Payload Design 6%Instrumentation 6%Sales 6%Sustainability evaluation 4%Engineering documentation 4%Structural testing 4%

Breakdown Coordinator

PS Logistics

Remote entry FULL TIME $55k–$75k Direct
Apply →

Apprentice - Structures

Airbus India Private Limited

Remote Entry FULL TIME $240k–$360k Direct
Apply →

Experienced Employee Development Specialist – Structures

Boeing

Remote Senior FULL TIME $85k–$115k Direct
Apply →

Working Party Aircraft Structure Expert

Airbus Americas, Inc.

Remote FULL TIME $95k–$135k Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

Remote Mid FULL TIME $57k–$77k Direct
Apply →

Structural Engineer

Amazon.com Services LLC

Remote FULL TIME $129k–$218k Direct
Apply →

Working Student, LV Structures (m/f/d)

Isar Aerospace SE

Remote $36k–$48k Direct
Apply →

Structural Engineer

CloudKitchens

Remote $70000k–$110000k Direct
Apply →

Structural Engineer

Western Partitions, Inc.

Remote $70k–$95k Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

Remote Mid FULL TIME $57k–$77k Direct
Apply →

Work Preparator

D. Cloostermans-Huwaert NV

Remote PART TIME $33k–$45k Direct
Apply →

Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management

Airbus Operations

Remote Student PART TIME $0k+ Direct
Apply →

Seat Structures Engineer (Mid-Level) (m/f/d)

Boeing Deutschland GmbH

Remote Mid-Level FULL TIME $68k–$88k Direct
Apply →

Senior Structures (Bridge) Design Engineer

CDR Maguire Engineering

Remote Senior FULL TIME $115k–$155k Direct
Apply →

Director, Structured Finance

Copia Power

Remote Director $225k–$325k Direct
Apply →

CVE / Senior Part 21J Structures Engineer (m/f/d)

Boeing Deutschland GmbH

Remote Senior FULL TIME $85k–$115k Direct
Apply →

Structures and Payload Design Engineer

Boeing Commercial Aviation Services Europe Limited

Remote FULL TIME $65k–$95k Direct
Apply →

Structural Engineer, Intermediate

DLR Group

Remote Intermediate $137k–$137k Direct
Apply →

Work Crew Supervisor

Center for Employment Opportunities

Remote FULL TIME $65k–$85k Direct
Apply →

Structural Bridge Engineer

Apex Companies

Remote $100k–$120k Direct
Apply →

Structural CAD Technician

EquipmentShare

Remote $65k–$85k Direct
Apply →

Experienced or Senior Structures Design Engineer

Boeing

Remote Senior FULL TIME $104k–$140k Direct
Apply →

Data Center Structural Engineer

Amazon Data Services, Inc.

Remote Mid FULL TIME $117k–$160k Direct
Apply →

Structures & Payload Design Engineer (Galley Insert Design) (Associate or Experienced)

Boeing

Remote FULL TIME $96k–$118k Direct
Apply →

Structures & Payload Design Engineer (Structural Design)

Boeing

Remote Senior FULL TIME $104k–$140k Direct
Apply →

Structures Load Control Instrumentation Engineer (Associate, Experienced or Senior)

The Boeing Company

Remote FULL TIME $85k–$115k Direct
Apply →

Senior Structural Engineer

Ware Malcomb

Remote Senior FULL TIME $115k–$155k Direct
Apply →

Structures & Payload Design Engineer (Galley Insert Design) (Associate or Experienced)

Boeing

Remote FULL TIME $96k–$118k Direct
Apply →

Structures Load Control Instrumentation Engineer (Associate, Experienced or Senior)

The Boeing Company

Remote FULL TIME $85k–$115k Direct
Apply →

Structured Trade Finance Manager

Engelhart

Remote Manager FULL TIME $155k–$220k Direct
Apply →

Structural Engineer

Coffman Engineers, Inc.

Remote mid FULL TIME $95k–$135k Direct
Apply →

Tax Structuring & Advisory Specialist

Jane Street

Remote Senior $180k–$280k Direct
Apply →

Structured Finance Portfolio Associate

KKR

Remote Mid $65k–$90k Direct
Apply →

Aircraft Structure Repair Engineer

Airbus

Remote Professional FULL TIME $1500k–$2500k Direct
Apply →

Senior Structural Design Engineer

BESIX

Remote mid FULL TIME $275k–$450k Direct
Apply →

Social Work - Mock Inspector

Liquid Personnel

Remote Senior $35k–$45k Direct
Apply →

Insurance Tax Structuring, AVP

KKR

Remote $120k–$160k Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

Remote Director FULL TIME $113k–$227k Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

Remote Director FULL TIME $113k–$227k Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

Remote FULL TIME $78k–$156k Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

Remote FULL TIME $78k–$156k Direct
Apply →

Associate Director Civil Structures

AtkinsRéalis

Remote Director FULL TIME $85k–$120k Direct
Apply →

Engineer II, Structural Analysis

Shield AI

Remote Mid FULL TIME $88k–$130k Direct
Apply →

Structural Manufacturing Engineer

ispace U. S.

Remote FULL TIME $81k–$122k Direct
Apply →

Experienced Structures Mechanic - B-52 (2400)

Boeing Aerospace Operations

Remote Senior FULL TIME $78k–$0k Direct
Apply →

Experienced Structures Mechanic - B-52 (2400)

Boeing Aerospace Operations

Remote Senior FULL TIME $78k–$0k Direct
Apply →

Civil Structural Engineer

AtkinsRéalis

Remote Mid FULL TIME $95k–$135k Direct
Apply →

Entry-Level Structural Analysis Engineer

Boeing Poland

Remote Entry FULL TIME $100k–$140k Direct
Apply →

Senior Associate, BESS Modeling & Structuring

Clearway Energy

Remote Senior $135k–$185k Direct
Apply →

Senior Associate, BESS Modeling & Structuring

Clearway Energy

Remote Senior $135k–$185k Direct
Apply →

Related Searches

Common Questions

Are there remote Work Breakdown Structures jobs available?
Yes — JobsGlitch lists remote Work Breakdown Structures jobs sourced daily from Greenhouse, Lever, Ashby, and Workday. No signup required to apply.
What skills do remote Work Breakdown Structures roles require?
Remote Work Breakdown Structures roles most commonly require Structural analysis, Structural engineering, Structural design, System integration, Stress analysis.
What is the salary for a remote Work Breakdown Structures?
The average salary for remote Work Breakdown Structures roles on JobsGlitch is approximately $1556k/year. Remote roles often offer competitive packages independent of location.