Home / Jobs / Work Breakdown Structures
Jobs by Role

Work Breakdown Structures
Jobs

No openings found right now · Updated daily

Active Work Breakdown Structures roles are indexed directly from company ATS systems — Greenhouse, Lever, Workday, Ashby, and 15+ others. Advertised salaries average $133k/year based on live listings. 18% of roles are remote-friendly. These listings don't come from other job boards — they're pulled from source, so many won't appear on LinkedIn, Indeed, or Glassdoor.

Open Roles

0

Avg Salary

$133k

Remote-Friendly

18%

Added This Week

47

50 shown

Breakdown Coordinator

PS Logistics

Tuscaloosa, AL, United States Onsite entry Direct
Apply →

Apprentice - Structures

Airbus India Private Limited

India Onsite Entry Direct
Apply →

Experienced Employee Development Specialist – Structures

Boeing

USA - Berkeley, MO Onsite Senior Direct
Apply →

Working Party Aircraft Structure Expert

Airbus Americas, Inc.

Mobile Area, AL Onsite Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

USA - Tukwila, WA Onsite Mid Direct
Apply →

Working Student, LV Structures (m/f/d)

Isar Aerospace SE

Ottobrunn, Bavaria, Germany Onsite Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

USA - Tukwila, WA Onsite Mid Direct
Apply →

Structural Engineer

Western Partitions, Inc.

Wilsonville, Oregon, United States Onsite Direct
Apply →

Work Preparator

D. Cloostermans-Huwaert NV

Hamme, Flanders, BEL Onsite Direct
Apply →

Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management

Airbus Operations

Germany Hybrid Student Direct
Apply →

Seat Structures Engineer (Mid-Level) (m/f/d)

Boeing Deutschland GmbH

DEU - Hamburg, Germany Onsite Mid-Level Direct
Apply →

Senior Structures (Bridge) Design Engineer

CDR Maguire Engineering

Harrisburg, Pennsylvania, United States Onsite Senior Direct
Apply →

Director, Structured Finance

Copia Power

Dana Point, California, United States Director Direct
Apply →

CVE / Senior Part 21J Structures Engineer (m/f/d)

Boeing Deutschland GmbH

DEU - Hamburg, Germany Onsite Senior Direct
Apply →

Structures and Payload Design Engineer

Boeing Commercial Aviation Services Europe Limited

GBR - Frimley, UK Onsite Direct
Apply →

Structural Engineer, Intermediate

DLR Group

Los Angeles, California, United States Hybrid Intermediate Direct
Apply →

Work Crew Supervisor

Center for Employment Opportunities

San Jose, California, United States Onsite Direct
Apply →

Structural Bridge Engineer

Apex Companies

Issaquah, Washington, United States Onsite Direct
Apply →

Experienced or Senior Structures Design Engineer

Boeing

USA - North Charleston, SC Onsite Senior Direct
Apply →

Structural CAD Technician

EquipmentShare

Columbia, Missouri, United States Direct
Apply →

Structures & Payload Design Engineer (Galley Insert Design) (Associate or Experienced)

Boeing

USA - Long Beach, CA Onsite Direct
Apply →

Structures & Payload Design Engineer (Structural Design)

Boeing

USA - Mesa, AZ Onsite Senior Direct
Apply →

Data Center Structural Engineer

Amazon Data Services, Inc.

Herndon, Virginia, USA Onsite Mid Direct
Apply →

Structures Load Control Instrumentation Engineer (Associate, Experienced or Senior)

The Boeing Company

USA - Mesa, AZ Onsite Direct
Apply →

Senior Structural Engineer

Ware Malcomb

Chicago, IL Onsite Senior Direct
Apply →

Structures & Payload Design Engineer (Galley Insert Design) (Associate or Experienced)

Boeing

USA - Long Beach, CA Onsite Direct
Apply →

Structures Load Control Instrumentation Engineer (Associate, Experienced or Senior)

The Boeing Company

USA - Mesa, AZ Onsite Direct
Apply →

Structural Engineer

Coffman Engineers, Inc.

Anchorage, AK, United States Onsite mid Direct
Apply →

Structured Trade Finance Manager

Engelhart

Stamford, Connecticut Onsite Manager Direct
Apply →

Tax Structuring & Advisory Specialist

Jane Street

Singapore Senior Direct
Apply →

Structured Finance Portfolio Associate

KKR

Dublin Onsite Mid Direct
Apply →

Aircraft Structure Repair Engineer

Airbus

India Onsite Professional Direct
Apply →

Social Work - Mock Inspector

Liquid Personnel

57 Spring Gardens, Manchester, M2 2BY Flexible Senior Direct
Apply →

Insurance Tax Structuring, AVP

KKR

Boston Hybrid Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

United States of America Remote Director Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

United States of America Remote Director Direct
Apply →

Associate Director Civil Structures

AtkinsRéalis

United Kingdom Hybrid Director Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

United States of America Remote Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

United States of America Remote Direct
Apply →

Engineer II, Structural Analysis

Shield AI

United States Onsite Mid Direct
Apply →

Structural Manufacturing Engineer

ispace U. S.

Englewood, Colorado Onsite Direct
Apply →

Experienced Structures Mechanic - B-52 (2400)

Boeing Aerospace Operations

USA - San Antonio, TX Onsite Senior Direct
Apply →

Experienced Structures Mechanic - B-52 (2400)

Boeing Aerospace Operations

USA - San Antonio, TX Onsite Senior Direct
Apply →

Civil Structural Engineer

AtkinsRéalis

CA.QC.Montréal.455 boul. René-Lévesque Ouest Hybrid Mid Direct
Apply →

Civil/Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Entry-Level Structural Analysis Engineer

Boeing Poland

POL - Warsaw, Poland Hybrid Entry Direct
Apply →

Senior Associate, BESS Modeling & Structuring

Clearway Energy

Denver, Colorado, United States Hybrid Senior Direct
Apply →

Senior Associate, BESS Modeling & Structuring

Clearway Energy

Denver, Colorado, United States Hybrid Senior Direct
Apply →

Civil/Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Steel Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Common Questions

How many Work Breakdown Structures jobs are available?
JobsGlitch lists active Work Breakdown Structures jobs sourced daily from Greenhouse, Lever, Ashby, Workday, and other top ATS platforms.
What skills are required for Work Breakdown Structures roles?
The most in-demand skills for Work Breakdown Structures roles are Structural analysis, Structural engineering, Structural design, System integration, Stress analysis. Requirements vary by seniority and company.
What is the average salary for a Work Breakdown Structures?
The average salary for Work Breakdown Structures roles on JobsGlitch is approximately $133k/year. Compensation varies by location, seniority, and company.
Are there remote Work Breakdown Structures jobs?
Yes — 18% of Work Breakdown Structures jobs on JobsGlitch are remote-friendly. Browse remote Work Breakdown Structures jobs at jobsglitch.com/jobs/remote/work-breakdown-structures.