See your match scores

Work Breakdown Structures Jobs in Delhi

No openings found

Active Work Breakdown Structures roles in Delhi, indexed directly from company ATS systems — not reposted from LinkedIn, Indeed, or Glassdoor. Upload your resume to see your match score against open positions.

Breakdown Coordinator

PS Logistics

Tuscaloosa, AL, United States Onsite entry Direct
Apply →

Apprentice - Structures

Airbus India Private Limited

India Onsite Entry Direct
Apply →

Structures Section Manager

United States-Pennsylvania-Philadelphia Onsite Manager Direct
Apply →

Structures Project Manager

Multiple Locations Onsite Manager Direct
Apply →

Assistant Structures Representative

HDR

Multiple Locations Onsite Direct
Apply →

Structural PE

HDR

Multiple Locations Onsite Entry Direct
Apply →

Working Party Aircraft Structure Expert

Airbus Americas, Inc.

Mobile Area, AL Onsite Direct
Apply →

Structural Engineer

HDR

Multiple Locations Mid Direct
Apply →

Structural EIT

HDR

Multiple Locations Onsite Direct
Apply →

Structural Engineer

Amazon.com Services LLC

Bellevue, Washington, USA Onsite Direct
Apply →

Experienced Employee Development Specialist – Structures

Boeing

USA - Berkeley, MO Onsite Senior Direct
Apply →

Structures and Mechanisms Engineer, ISS Sustaining

Barrios

United States-Texas-Houston Onsite Junior Direct
Apply →

Structural Engineer

Multiple Locations Onsite Direct
Apply →

Structural Engineer

United States-Indiana-Indianapolis Onsite Direct
Apply →

Working Student, LV Structures (m/f/d)

Isar Aerospace SE

Ottobrunn, Bavaria, Germany Onsite Direct
Apply →

Structural Engineer

United States-Florida-Orlando Onsite Direct
Apply →

Structural Engineer

CloudKitchens

Colombia, Huila, Colombia Onsite Direct
Apply →

Structural Engineer

Western Partitions, Inc.

Wilsonville, Oregon, United States Onsite Direct
Apply →

Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management

Airbus Operations

Germany Hybrid Student Direct
Apply →

Structural Intern

United States-Louisiana-Baton Rouge Onsite Direct
Apply →

Seat Structures Engineer (Mid-Level) (m/f/d)

Boeing Deutschland GmbH

DEU - Hamburg, Germany Onsite Mid-Level Direct
Apply →

Structural Project Engineer

AKS Engineering & Forestry, LLC

Medford, Oregon, United States Onsite Entry Direct
Apply →

Structural Project Engineer

AKS Engineering & Forestry, LLC

Vancouver, Washington, United States Onsite Entry Direct
Apply →

Structural Engineer

BERNARD Gruppe

Delhi, Delhi, Indien Onsite experienced Direct
Apply →

Senior Structural Engineer

Multiple Locations Onsite Senior Direct
Apply →

Structural Bridge Engineer

Apex Companies

Issaquah, Washington, United States Onsite Direct
Apply →

Senior Structural Engineer

HDR

United States-Illinois-Chicago Onsite Senior Direct
Apply →

Structural Engineer (Transportation)

HDR

United States-New York-New York Senior Direct
Apply →

CVE / Senior Part 21J Structures Engineer (m/f/d)

Boeing Deutschland GmbH

DEU - Hamburg, Germany Onsite Senior Direct
Apply →

Structural EIT/Designer

HDR

Multiple Locations Onsite Direct
Apply →

Structured Trade Finance Manager

Engelhart

Stamford, Connecticut Onsite Manager Direct
Apply →

Civil/Structural Designer

Atwell, LLC

Texas, United States Flexible Direct
Apply →

Structural Engineer - Power

HDR

Multiple Locations Onsite Direct
Apply →

Structural BIM Lead

HDR

Multiple Locations Lead Direct
Apply →

Structural Engineer - Steel Structure Specialist

Kanadevia Inova

Milano, Lombardia, Italy Onsite mid Direct
Apply →

Structural Coordinator/EIT

United States-California-Los Angeles Onsite Direct
Apply →

Director, Structured Finance

Copia Power

Dana Point, California, United States Director Direct
Apply →

Structural Coordinator/EIT

United States-Texas-Dallas Onsite Direct
Apply →

Structural Packaging Designer

Everstar

Kyiv | Київ, UA Direct
Apply →

Senior Structural Engineer

Rimkus

Vancouver, British Columbia, Canada Senior Direct
Apply →

Senior Structural Design Engineer

BESIX

Dubai, Dubai, AE Onsite mid Direct
Apply →

Structural Engineer, Intermediate

DLR Group

Los Angeles, California, United States Hybrid Intermediate Direct
Apply →

Structures & Payload Design Engineer (Galley Insert Design) (Associate or Experienced)

Boeing

USA - Long Beach, CA Onsite Direct
Apply →

Substation Project Structural Engineer

HDR Engineering

Multiple Locations Mid Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

USA - Tukwila, WA Onsite Mid Direct
Apply →

Senior Substation Structural Engineer

HDR

Multiple Locations Senior Direct
Apply →

Structures & Payload Design Engineer (Structural Design)

Boeing

USA - Mesa, AZ Onsite Senior Direct
Apply →

Structural BIM Specialist 3

HDR

Multiple Locations Onsite Senior Direct
Apply →

Senior Construction Engineer, Structural

HDR

Canada-Ontario-Toronto Onsite Senior Direct
Apply →

Data Center Structural Engineer

Amazon Data Services, Inc.

Herndon, Virginia, USA Onsite Mid Direct
Apply →

See how you match these Work Breakdown Structures roles

Upload your resume and get a skill match score for every job

Get match scores →

Common Questions

How many work breakdown structures jobs in delhi are available?
JobsGlitch lists active work breakdown structures jobs in delhi sourced directly from company ATS platforms — not reposted from LinkedIn.
Are these Work Breakdown Structures roles actually hiring in Delhi?
Yes — every listing is indexed directly from company career pages (Greenhouse, Lever, Workday, Ashby). These are not aggregated from other job boards, so they reflect live hiring intent.
What skills do Work Breakdown Structures jobs in Delhi require?
Required skills vary by employer and seniority. Browse the listings above to see the specific requirements for each open role.
How do I apply for work breakdown structures jobs in delhi?
Click any job listing to view the full description and apply directly on the company's career page. Upload your resume on JobsGlitch first to see your match score before applying.