See your match scores

Remote Work Breakdown Structures Jobs

No openings found

Active Work Breakdown Structures roles available remotely, indexed directly from company ATS systems — not reposted from LinkedIn, Indeed, or Glassdoor. Upload your resume to see your match score against open positions.

Breakdown Coordinator

PS Logistics

Tuscaloosa, AL, United States Onsite entry Direct
Apply →

Apprentice - Structures

Airbus India Private Limited

India Onsite Entry Direct
Apply →

Assistant Structures Representative

HDR

Multiple Locations Onsite Direct
Apply →

Working Party Aircraft Structure Expert

Airbus Americas, Inc.

Mobile Area, AL Onsite Direct
Apply →

Experienced Employee Development Specialist – Structures

Boeing

USA - Berkeley, MO Onsite Senior Direct
Apply →

Structural Engineer

Amazon.com Services LLC

Bellevue, Washington, USA Onsite Direct
Apply →

Working Student, LV Structures (m/f/d)

Isar Aerospace SE

Ottobrunn, Bavaria, Germany Onsite Direct
Apply →

Structural Engineer

United States-Indiana-Indianapolis Onsite Direct
Apply →

Working Student (d/f/m) in Structure Design – Fuselage Structure & Project Management

Airbus Operations

Germany Hybrid Student Direct
Apply →

Structural Engineer

CloudKitchens

Colombia, Huila, Colombia Onsite Direct
Apply →

Structural Engineer

Western Partitions, Inc.

Wilsonville, Oregon, United States Onsite Direct
Apply →

Seat Structures Engineer (Mid-Level) (m/f/d)

Boeing Deutschland GmbH

DEU - Hamburg, Germany Onsite Mid-Level Direct
Apply →

Structural Project Engineer

AKS Engineering & Forestry, LLC

Medford, Oregon, United States Onsite Entry Direct
Apply →

Structural Bridge Engineer

Apex Companies

Issaquah, Washington, United States Onsite Direct
Apply →

Structural Engineer (Transportation)

HDR

United States-New York-New York Senior Direct
Apply →

CVE / Senior Part 21J Structures Engineer (m/f/d)

Boeing Deutschland GmbH

DEU - Hamburg, Germany Onsite Senior Direct
Apply →

Structured Trade Finance Manager

Engelhart

Stamford, Connecticut Onsite Manager Direct
Apply →

Director, Structured Finance

Copia Power

Dana Point, California, United States Director Direct
Apply →

Structural Coordinator/EIT

United States-California-Los Angeles Onsite Direct
Apply →

Senior Structural Design Engineer

BESIX

Dubai, Dubai, AE Onsite mid Direct
Apply →

Senior Structural Engineer

Rimkus

Vancouver, British Columbia, Canada Senior Direct
Apply →

Structural Engineer, Intermediate

DLR Group

Los Angeles, California, United States Hybrid Intermediate Direct
Apply →

Structures & Payload Design Engineer (Galley Insert Design) (Associate or Experienced)

Boeing

USA - Long Beach, CA Onsite Direct
Apply →

Structures & Payload Design Engineer (Structural Design)

Boeing

USA - Mesa, AZ Onsite Senior Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

USA - Tukwila, WA Onsite Mid Direct
Apply →

Structural CAD Technician

EquipmentShare

Columbia, Missouri, United States Direct
Apply →

Data Center Structural Engineer

Amazon Data Services, Inc.

Herndon, Virginia, USA Onsite Mid Direct
Apply →

Data Center Structural Engineer

Amazon Data Services, Inc.

Herndon, Virginia, USA Onsite Direct
Apply →

Senior Structural Engineer

Ware Malcomb

Chicago, IL Onsite Senior Direct
Apply →

Structures Technical Analyst (Associate and Mid-Level)

Boeing

USA - Tukwila, WA Onsite Mid Direct
Apply →

Work Preparator

D. Cloostermans-Huwaert NV

Hamme, Flanders, BEL Onsite Direct
Apply →

Structural EIT/ Designer- Buildings

United States-Montana-Missoula Onsite Direct
Apply →

Civil/Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Civil/Structural Inspector

AtkinsRéalis

United Arab Emirates Onsite Direct
Apply →

Tax Structuring & Advisory Specialist

Jane Street

Singapore Senior Direct
Apply →

Structured Finance Portfolio Associate

KKR

Dublin Onsite Mid Direct
Apply →

Structural Engineer

Coffman Engineers, Inc.

Anchorage, AK, United States Onsite mid Direct
Apply →

Insurance Tax Structuring, AVP

KKR

Boston Hybrid Direct
Apply →

Aircraft Structure Repair Engineer

Airbus

India Onsite Professional Direct
Apply →

Structures and Payload Design Engineer

Boeing Commercial Aviation Services Europe Limited

GBR - Frimley, UK Onsite Direct
Apply →

Experienced or Senior Structures Design Engineer

Boeing

USA - North Charleston, SC Onsite Senior Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

United States of America Remote Director Direct
Apply →

Tooling Mechanic - Large Structure Fabrication

The Boeing Company

USA - Berkeley, MO Onsite Direct
Apply →

Regional Sales Director, Structural Heart - Structural Interventions

Abbott

United States of America Remote Director Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

United States of America Remote Direct
Apply →

Clinical Sales Specialist, Structural Heart - Structural Interventions

Abbott

United States of America Remote Direct
Apply →

Senior Structural Civil Engineer

AtkinsRéalis

CA.QC.Montréal.455 boul. René-Lévesque Ouest Hybrid Senior Direct
Apply →

Engineer II, Structural Analysis

Shield AI

United States Onsite Mid Direct
Apply →

Structural Manufacturing Engineer

ispace U. S.

Englewood, Colorado Onsite Direct
Apply →

Senior Structures (Bridge) Design Engineer

CDR Maguire Engineering

Harrisburg, Pennsylvania, United States Onsite Senior Direct
Apply →

See how you match these Work Breakdown Structures roles

Upload your resume and get a skill match score for every job

Get match scores →

Common Questions

How many remote work breakdown structures jobs are available?
JobsGlitch lists active remote work breakdown structures jobs sourced directly from company ATS platforms — not reposted from LinkedIn.
Are these Work Breakdown Structures roles actually hiring remotely?
Yes — every listing is indexed directly from company career pages (Greenhouse, Lever, Workday, Ashby). These are not aggregated from other job boards, so they reflect live hiring intent.
What skills do Work Breakdown Structures jobs remotely require?
Required skills vary by employer and seniority. Browse the listings above to see the specific requirements for each open role.
How do I apply for remote work breakdown structures jobs?
Click any job listing to view the full description and apply directly on the company's career page. Upload your resume on JobsGlitch first to see your match score before applying.