IOTA GROUP

Energy

WarehouseCoordinator

$45000–75000k ~AI est. Basrah, Basra Governorate, Iraq CONTRACT
Market Sentiment
HIGH DEMAND

Neural analysis suggests this role is
optimal for mid candidates.

The Brief

“Warehouse Coordinator at IOTA GROUP. Skills: Warehouse management, Material management, Logistics control. Support and enforce project guidelines. Enforce HSE Rules and Company Specifications”

What You'll Achieve.

Guarantee transparency in relations with subcontractors; Ensure material management for EGF activities; Achieve safety, cost efficiency, high quality; Deliver in time; Comply with legal aspects; Minimize disturbance to Ratawi CPF1 operations

Industry & Context.

Energy
Problems you'll solve

Resolve technical issues; Propose alternative solutions

Eligibility Requirements

Rotational basis (4 On/4 Off), 6 months duration

What They're Looking For.

Must Have

Bachelor's degree in engineering or construction, 10 to 15 years of experience in oil industry, Significant experience in Construction, Fluent in English

Nice to Have

Previous experience under SIMOPS works, Arabic language proficiency

What You'll Do.

Support and enforce project guidelines

Enforce HSE Rules and Company Specifications

Attend HSE meetings and training

Initiate and/or Participate in Job Safety Analysis

Stop dangerous situations

Report anomalies and dangerous acts

Conduct toolbox talks

Enforce safe work practices

Lead and coordinate warehouse and material management

Follow up and ensure Contractor carries out works

Ensure adherence to project specifications

Review and validate construction methods

Ensure proper execution of works

Check procedures and task sheets

or control risk analyses

Help in preparation / check work permits

Resolve technical issues on-site

Manage subcontractors

Ensure proper allocation of manpower and equipment

Optimize and follow up work schedules

Check good organization of logistics

Control material deliveries

Verify conformity with project requirements

Anticipate all potential problems

Propose alternative practical solutions

Organise Pre-commissioning activities

Formalize handover dossier to Field Operations

Ensure mark-up documentation reflects site condition

Forward documentation to Engineering

Report daily to Construction Manager

Maintain good relationships with contractors

Enforce necessary standards

How You'll Work.

Team & Collaboration

Work collaboratively across complex project teams; Interface between interdisciplinary departments; Work within an international team

Process & Methodology

Planning, Scheduling

Full Job Description

Our client is a global multi-energy company operating large-scale refining and petrochemical facilities. It transforms crude oil into fuels and essential industrial products through highly integrated and technologically advanced operations. The organisation is recognized for its strong HSE culture, operational excellence, and commitment to reducing environmental impact. Joining the company means contributing to complex international projects within a high-performance industrial environment. Total Energies signed major agreements covering several projects in the Basra region, designed to enhance the development of Iraq’s natural resources and to improve the country’s electricity supply. EGE project is part of the Iraq Gas Growth Integrated Projects (GGIP) deal signed in September 2021 with the objective to develop multi energies projects. After a proposal to reinject the AGUP ph1 associated gas, it has been decided end of 2023 to valorize the HP associated gas and to build an early gas treatment facility (EGEP). It is a fast-track project. The main challenges are: • Image/reputation of TotalEnergies in Iraq to succeed to start this EGE project (+ AGUP Ph1 + Solar Project) in 2025. Pressure placed by Iraqi government (Prime Minister + Minister of Oil) on TotalEnergies, and pressure placed on projects by TotalEnergies management. • Efficiency of installation in order to ensure the gas treatment and the reduction of flaring which is very important for the Iraqi government. • Costs: 300 M$ CAPEX+OPEX • Planning. Very challenging planning with ultra fast-track development (Detailed Engineering/Execution). • Management of authorities and interfaces. ArtawiGas 25 is executed out of TotalEnergies General Specifications perimeter, overall engineering under applicable international standards Goals The Warehouse coordinator is responsible of material management for the EGF activities: 1) Safety, 2) cost efficient, 3) high quality according to specifications, 4) in time, 5) in l

Free ATS check

Applying for this Warehouse Coordinator role?

Most applicants get filtered before a human reads their resume. See if yours makes the cut.

How to Apply on SmartRecruiters

  • SmartRecruiters often includes a video screening step — check camera and mic permissions.
  • Link your GitHub or portfolio directly in the profile section for technical roles.
  • Applications may be reviewed by AI scoring before reaching a recruiter — use keywords from the job description.

ANONYMOUS · UNFILTERED

What do employees actually say about IOTA GROUP?

Real rants from real employees. Read before you apply.

Read Company Rants →