Jabil
Sr.MasterPlanner
Neural analysis suggests this role is
optimal for Senior candidates.
“Sr. Master Planner at Jabil. Skills: Master Production Schedule, Capacity planning, Customer demand analysis. Manage planning activities. Mentor Production Planners”
What You'll Achieve.
Ensure 100% on-time delivery; Achieve 95% MPS goal
Industry & Context.
Solve practical problems; Interpret instructions; Analyze requirements; Communicate constraints; Drive resolution; Resolve MPS issues
What They're Looking For.
Must Have
HS Diploma or equivalent, Bachelor's degree, 8 years in Planning Activities, 5 years as Master Planner, Advanced PC skills, Ability to read and interpret documents, Ability to write routine reports, Ability to speak effectively before groups, Ability to add, subtract, multiply, and divide, Ability to compute rate, ratio, and percent, Ability to draw and interpret bar graphs, Ability to solve practical problems, Ability to interpret a variety of instructions
Nice to Have
APICS certification, Supervisor experience
What You'll Do.
Manage planning activities
Mentor Production Planners
Mentor Document Coordinators
Ensure 100% on-time delivery
Establish build readiness
Maintain capacity efficiency
Maintain customer sizing
Maintain accurate revenue forecasting
Maintain material control
Maintain material liability
Develop Master Production Schedule
Load MPS into ERP system
Reconcile MPS to customer PO
Ensure MPS achievability
Own production planning
Analyze material requirements
Analyze capacity requirements
Communicate constraints to Workcell
Communicate constraints to customer
Maintain workcell capacity planning
Drive resolution on uneven capacity
Meet daily with Workcell
Meet daily with manufacturing team
Assess production schedules
Adjust production schedules
Optimize run quantities
Maintain customers' latest contract
Support Production Planner goal
Lead Workcell on BOM creation
Lead Workcell on routing creation
Own EOL build schedule
Own EOL MPS resolution
Own EOL planned tactics
Own EOL last shipment deadline
Support plan for potential RMAs
Manage Jabil purge process
Adhere to safety rules
Adhere to health rules
Comply with security policy
How You'll Work.
Team & Collaboration
Workcell team; Manufacturing team; Customer demand
Communication Scope
Speak effectively before groups
Full Job Description
At Jabil (NYSE: JBL), we are proud to be a trusted partner for the world's top brands, offering comprehensive engineering, supply chain, and manufacturing solutions. With 60 years of experience across industries and a vast network of over 100 sites worldwide, Jabil combines global reach with local expertise to deliver both scalable and customized solutions. Our commitment extends beyond business success as we strive to build sustainable processes that minimize environmental impact and foster vibrant and diverse communities around the globe. SUMMARY Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell. ESSENTIAL DUTIES AND RESPONSIBILITIES • Ensure 100% on-time delivery. • Establish build readiness. • Maintain efficiency of capacity and customer sizing. • Maintain accurate revenue forecasting. • Maintain material control and liability. • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage. • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand. • Ensure the MPS is always 100% accurate and achievable. • Achieve and maintain 95% MPS goal. • Own production planning, BOM and document control with or without additional support. • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand. • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources. • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery. • Maintain the customers’ latest contract on file
Applying for this Sr. Master Planner role?
Most applicants get filtered before a human reads their resume. See if yours makes the cut.
How to Apply on Workday
- Workday has a multi-step form — save your progress after every section.
- "Apply With LinkedIn" can fail or lose data; manual entry is more reliable.
- Watch for the "Submit for Review" final step — hitting "Save" alone does not submit.
- Job requisition numbers are useful when following up with HR by email.
ANONYMOUS · UNFILTERED
What do employees actually say about Jabil?
Real rants from real employees. Read before you apply.