Jabil

Sr.MasterPlanner

Guadalajara, Mexico FULL TIME
Market Sentiment
HIGH DEMAND

Neural analysis suggests this role is
optimal for Senior candidates.

The Brief

“Sr. Master Planner at Jabil. Skills: Master Production Schedule (MPS), production planning, material planning, capacity planning, BOM management, vendor/stakeholder management, continuous improvement. Manage all planning activities for the dedicated assigned workcell. Ensure 100% on-time delivery”

What You'll Achieve.

Ensure 100% on-time delivery; Achieve and maintain 95% MPS goal

Industry & Context.

Problems you'll solve

Ability to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists; Ability to interpret a variety of instructions furnished in written, oral, diagram, or schedule form; drive resolution on uneven capacity utilization

Eligibility Requirements

Adhere to all safety and health rules and regulations, Comply and follow all procedures within the company security policy

What They're Looking For.

Must Have

HS Diploma or equivalent, Bachelor’s degree, Advanced PC skills, Ability to read and interpret documents such as safety rules, operating and maintenance instructions, and procedure manuals, Ability to write routine reports and correspondence, Ability to speak effectively before groups of customers or employees of organization, Ability to add, subtract, multiply, and divide in all units of measure, using whole numbers, common fractions, and decimals, Ability to compute rate, ratio, and percent and to draw and interpret bar graphs, Ability to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists, Ability to interpret a variety of instructions furnished in written, oral, diagram, or schedule form, Thorough knowledge of MRP, lead times for specific component types, internal run rates, test development lead times, machine programming lead times and complete understanding of the chronological sequence of events that must occur in order to build a product, 5 years of them as Master Planner

Nice to Have

APICS certification, Supervisor experience

What You'll Do.

Manage all planning activities for the dedicated assigned workcell

Ensure 100% on-time delivery

Establish build readiness

Maintain efficiency of capacity and customer sizing

Maintain accurate revenue forecasting

Maintain material control and liability

Develop Master Production Schedule (MPS) and load into Jabil’s ERP system

including Purchase Order (PO) coverage

Reconcile the MPS to customer PO coverage weekly

Ensure the MPS is always 100% accurate and achievable

Achieve and maintain 95% MPS goal

Own production planning

BOM and document control with or without additional support

Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand

Maintain the workcell’s capacity planning drive resolution on uneven capacity utilization

Meet daily with the Workcell and manufacturing team to assess production schedules

optimize run quantities

and minimize changeovers

Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling

Be the workcell’s “expert” on all planning activities

Lead the Workcell on the creation of Bills of Material (BOMs) and routings

End-of Life (EOL) management

Manage Jabil purge process for internal Workcell purges

How You'll Work.

Team & Collaboration

mentor the Production Planners and Document Coordinators; communicate constraints to the Workcell and customer; Meet daily with the Workcell and manufacturing team

Communication Scope

Ability to speak effectively before groups of customers or employees of organization; communicate constraints to the Workcell and customer

Process & Methodology

Develop Master Production Schedule (MPS), End-of Life (EOL) management

Full Job Description

At Jabil (NYSE: JBL), we are proud to be a trusted partner for the world's top brands, offering comprehensive engineering, supply chain, and manufacturing solutions. With 60 years of experience across industries and a vast network of over 100 sites worldwide, Jabil combines global reach with local expertise to deliver both scalable and customized solutions. Our commitment extends beyond business success as we strive to build sustainable processes that minimize environmental impact and foster vibrant and diverse communities around the globe. SUMMARY Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell. ESSENTIAL DUTIES AND RESPONSIBILITIES • Ensure 100% on-time delivery. • Establish build readiness. • Maintain efficiency of capacity and customer sizing. • Maintain accurate revenue forecasting. • Maintain material control and liability. • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage. • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand. • Ensure the MPS is always 100% accurate and achievable. • Achieve and maintain 95% MPS goal. • Own production planning, BOM and document control with or without additional support. • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand. • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources. • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery. • Maintain the customers’ latest contract on file

Free ATS check

Applying for this Sr. Master Planner role?

Most applicants get filtered before a human reads their resume. See if yours makes the cut.

How to Apply on Workday

  • Workday has a multi-step form — save your progress after every section.
  • "Apply With LinkedIn" can fail or lose data; manual entry is more reliable.
  • Watch for the "Submit for Review" final step — hitting "Save" alone does not submit.
  • Job requisition numbers are useful when following up with HR by email.

ANONYMOUS · UNFILTERED

What do employees actually say about Jabil?

Real rants from real employees. Read before you apply.

Read Company Rants →