Pierce Manufacturing
PrincipalCostEstimatorEngineer
Neural analysis suggests this role is
optimal for Senior candidates.
“Principal Cost Estimator Engineer at Pierce Manufacturing. Skills: Cost estimating, Cost analysis, Supplier negotiation. Provide estimates for proposal development. Provide estimates for current production cost reductions”
What You'll Achieve.
Cost reduction; Cost avoidance
Industry & Context.
10% travel
What They're Looking For.
Must Have
Bachelor's degree in Mechanical Engineering, 5+ years experience, Experience with CACE tools, Ability to travel 10%
Nice to Have
Hands-on mechanical aptitude, Supply chain experience, Engineering experience in manufacturing, Advanced understanding of Cost Accounting, Knowledge of manufacturing sequence, Knowledge of Bill of Materials, Ability to read Engineering drawings, Interpret GD&T, Ability to effectively communicate, Time-management skills, Prioritization skills, Multi-tasking ability, Meet deadlines, Experience with Microsoft Office Suite, Proficiency with SharePoint
What You'll Do.
Provide estimates for proposal development
Provide estimates for current production cost reductions
Provide estimates for new product development
Identify cost model drivers
Build cost model drivers
Analyze supplier quotations
Identify cost drivers
Participate in cost negotiation process
Influence cost reduction
Influence cost avoidance
Consult with product development engineers
Advise product development engineers
Suggest economic alternatives
Suggest design trade-offs
Interface with supplier engineers
Develop should cost models
Understand cost drivers
Share project results
How You'll Work.
Team & Collaboration
Work with engineers; Work with sourcing; Work with suppliers; Cross-functional teams
Communication Scope
Effective communication
Full Job Description
**About Pierce, an Oshkosh company** **At Pierce Manufacturing, we build trucks that protect people and communities around the world. To our team, there is no room for anything less than providing the absolute best. Since 1913, building truck bodies on Model T Ford chassis in an old converted church has evolved to creating highly customized, carefully designed and engineering pumpers, aerials, tankers and rescue units that have no equal. Today, you 'll find more than ****30,000 Pierce apparatuses** **on the road that are making a difference in people 's lives, every day. To us, every step in the process of building our trucks is personal. From innovation and expertise, to the customization and service. Our trucks are designed to perform under the toughest conditions.** **Principal Cost Estimator Engineer** **R43695** The Principal Cost Estimator Engineer will deliver cost estimates for new and existing parts by gathering and analyzing market data to include raw materials, purchased components, and manufacturing processes required to complete costing. The role will work side-by-side with engineers, sourcing and suppliers. **YOUR IMPACT** These duties are not meant to be all-inclusive and other duties may be assigned. * Provide estimates for proposal development, current production cost reductions, and new product development design to cost initiatives. * Identify and build cost model drivers to assist in design and purchasing activities. * Analyze supplier quotations and identify cost drivers (materials, labor, overheads, tooling, logistics, profit margins). * Participate in cost negotiation process to influence cost reduction and cost avoidance. * Consult with and advise product development engineers on economic alternatives for their design and suggest trade-offs. * Interface directly with supplier engineers to develop mutually agreed upon should cost models to understand cost drivers for use in pricing negotiations ongoing cost reduction activities. * Present idea
Applying for this Principal Cost Estimator Engineer role?
Most applicants get filtered before a human reads their resume. See if yours makes the cut.
How to Apply on Workday
- Workday has a multi-step form — save your progress after every section.
- "Apply With LinkedIn" can fail or lose data; manual entry is more reliable.
- Watch for the "Submit for Review" final step — hitting "Save" alone does not submit.
- Job requisition numbers are useful when following up with HR by email.
ANONYMOUS · UNFILTERED
What do employees actually say about Pierce Manufacturing?
Real rants from real employees. Read before you apply.