Ontario Transit Group

Construction

ConstructionSurveyor

CA$75–95k Toronto, Ontario, Canada FULL TIME
Market Sentiment
HIGH DEMAND

Neural analysis suggests this role is
optimal for mid candidates.

The Brief

“Construction Surveyor at Ontario Transit Group. Skills: Tunnel surveying, SEM tunneling, TBM tunneling, Survey data. Perform precise surveys. Set out work”

Industry & Context.

Construction
Eligibility Requirements

Rotating shifts, Work nights

What They're Looking For.

Must Have

5 years construction surveying, Tunnel surveying experience, SEM and TBM methods, Operate survey equipment, Knowledge of AutoCAD, Knowledge of Civil 3D, Work rotating shifts, Work nights

Nice to Have

Diploma in Surveying, Degree in Surveying, Diploma in Geomatics, Degree in Geomatics

What You'll Do.

Perform precise surveys

Monitor tunneling operations

Provide alignment control

Conduct quality checks

Operate survey equipment

Maintain survey equipment

Adhere to safety regulations

Conduct survey activities safely

How You'll Work.

Team & Collaboration

Work with construction team; Collaborate with engineers; Collaborate with supervisors; Collaborate with TBM operators

Communication Scope

Effective collaboration

Full Job Description

Ferrovial Construction Canada Inc. and VINCI Construction Grands Projets are undertaking the design, build, and finance the Ontario Line Southern Civil, Stations, and Tunnel (South Civil) package. As Ontario Transit Group, we are now mobilizing our design and construction crews, with major works. The South Civil contract is anticipated to be completed in 2030. The project will strengthen Ontario’s economy by supporting an estimated 1,500 jobs at the peak of construction. What is the project? * A six-kilometer tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River). * Stations: * One above-ground station to be integrated with the existing GO Transit Exhibition Station. * Two underground stations to be integrated with the existing TTC Osgoode and Queen subway stations. * Four new underground stations (King/Bathurst, Queen/Spadina, Moss Park, Corktown). The benefits to Ontario Faster, more frequent, and reliable access to rapid transit with more than 227,500 people will live within a 10-minute walk of an Ontario Line station. * Improve the quality of life for commuters by reducing daily travel time. * Reduce crowding on the existing Line 1 (Yonge-University) subway. * Up to 57,000 more jobs accessible by transit (in 45 minutes or less) for Toronto residents. * Economic and community growth along the future transit line and thousands of job opportunities annually during construction. * Reduction in traffic congestion, greenhouse gases, and fuel consumption by providing an alternative transportation option. The SEM/TBM Surveyor will support the tunneling operations on the Ontario Line South project. This role will be responsible for providing accurate survey data to ensure the successful alignment and construction of the tunnel, whether using the Sequential Excavation Method (SEM) or Tunnel Boring Machine (TBM). This position requires flexibility, including the ability to work rotating shifts, including nights. The salary range f

Free ATS check

Applying for this Construction Surveyor role?

Most applicants get filtered before a human reads their resume. See if yours makes the cut.

How to Apply on SmartRecruiters

  • SmartRecruiters often includes a video screening step — check camera and mic permissions.
  • Link your GitHub or portfolio directly in the profile section for technical roles.
  • Applications may be reviewed by AI scoring before reaching a recruiter — use keywords from the job description.

ANONYMOUS · UNFILTERED

What do employees actually say about Ontario Transit Group?

Real rants from real employees. Read before you apply.

Read Company Rants →